SMB Contractor
$3.5-8.5K
Duration: 8-12 weeks
- ✓Project tracking
- ✓Billing module
- ✓Mobile field app
- ✓Document management
Construction sector
Manage site progress, progress billing, subcontractors, materials, and budget in a single digital platform for construction companies.
Quick answer
Construction software in 2026 includes site progress tracking (Gantt/timeline) + progress billing management + subcontractor contracts + material stock + budget deviation alerts + mobile field app. SMB contractor: $3.5-8.5K. Large contractor: $10-50K. 8-18 weeks.
~$60B+
Turkey construction sector size (2025)
Average 20-30%
Project cost overrun rate
30-50%
Delay reduction with digital tracking
80% fewer with digital
Billing dispute rate (digital vs manual)
Before building solutions, we make the problems we solve explicit.
Progress is only known via phone calls or weekly meetings. By the time delays are noticed, penalties or cost increases are often unavoidable.
Contractor + subcontractor billing manually calculated in Excel. High error risk, frequent disputes.
High material churn on site; unknown what material is where and how much remains. Over-ordering = waste, under-ordering = work stoppage.
Cost overruns only clarify at project end; no early warning. Real-time budget tracking makes critical deviations visible instantly.
12+ sector-specific features bundled across pricing tiers.
→Project timeline
Gantt chart, milestones, critical path analysis
→Site progress tracking
Work items, completion rate, photo log
→Progress billing management
Contractor + subcontractor billing, approval flow, payment schedule
→Subcontractor contracts
Digital contract, scope of work, payment plan
→Material + stock tracking
Site stock, order tracking, supplier comparison
→Budget control
Planned vs actual cost, deviation alerts
→Mobile field app
Foreman/engineer iOS+Android: progress notes, photos, issues
→Document management
Project drawings, permits, inspection docs — digital archive
→Client portal
Client access to construction progress + budget + photos
→Reporting
Progress report, cost analysis, subcontractor performance
Sector-specific 3rd-party APIs — setup and maintenance included.
Fixed-scope written proposal after a 30-minute discovery call.
$3.5-8.5K
Duration: 8-12 weeks
$8.5-24K
Duration: 12-18 weeks
$24K+
Duration: 18-30 weeks
Migration typically takes 4-6 weeks. Existing Excel templates are imported; billing line items and subcontractor list are imported. 1-2 months of parallel operation is recommended.
Yes — offline-first design keeps the field working during connectivity loss; syncs when connection returns. Critical feature for construction sites.
Password-protected access via client portal — weekly photos, progress summary, budget status. Corporate clients can have a white-label version with custom domain.
In a 30-minute discovery call we share a written scope + price + timeline tailored to your business.
Start a discovery call