Intro: "I know Flutter" is not enough#
1. Portfolio + live app: real or staged?#
2. Architecture: state management + folder structure#
features/auth/, features/orders/) is the modern standard. Layer-first (models/, screens/, services/) is old-school and breaks down in mid-large projects.3. Performance: the 60fps discipline#
setState across the whole app (every small change rebuilds the entire tree), creating new objects in build on every render, not optimizing images (cached_network_image + thumbnails).const constructors on critical pages, set itemExtent + cacheExtent in ListViews, use image placeholders + lazy loading, and run an inspector report on every page for 60fps."4. Testing + CI/CD: the insurance of quality#
5. Native integration capability#
6. Communication + demo cadence: delivery confidence#
7. Contract + code ownership#
Conclusion: clarify the 7 criteria in a 1-hour technical call#
Related articles
Other articles that support the same decision
Proposal Process
How to Prepare a Project Before Requesting a Proposal
A 6-section preparation checklist for faster, more accurate proposals: goal, scope, references, budget, GDPR/KVKK, documentation. Good preparation doubles proposal quality.
Agency Selection
10 Questions to Ask Before Hiring a Software Agency
Choosing an agency is not about portfolio screenshots — it's about delivery model, decision quality, and contract clarity. The cost of a wrong pick shows up 6-12 months later.
AI Tools
What is Claude AI? A Comprehensive 2026 Developer Guide
Comprehensive guide to Claude AI's 2026 capabilities — Claude Code, MCP, API integration, KVKK compliance, and enterprise case studies for software developers.
Next step
If you are planning a similar project, we can clarify the scope and shape the right proposal flow together.
Start a project request